« Loading the LPR! | Main | Slow progress »

Moving forward

The LPR has been populated. It took about 90 minutes. Not too bad! I copied collive to coltesta on admin5 so we have the most current data in the new coll18 test environment. Next step was to copy coltesta to /datatel/coll18/test/apphome. You should all add that database to your UI since, as soon as it is converted to R18 (hopefully tomorrow) terminal mode won't work! I'll be building MOVEINFO records for the foreseeable future.

Post a comment

(If you haven't left a comment here before, you may need to be approved by the site owner before your comment will appear. Until then, it won't appear on the entry. Thanks for waiting.)

About

This page contains a single entry from the blog posted on April 26, 2007 2:59 PM.

The previous post in this blog was Loading the LPR!.

The next post in this blog is Slow progress.

Many more can be found on the main index page or by looking through the archives.

Powered by
Movable Type 3.36